
High Quality Auto Die Casting Part
Qingdao Root Industrial and Trading Co., Ltd.- Die Casting Machine Type:Cold Chamber Die Casting Machine
- Die Casting Method:Vacuum Die Casting
- Application:Machinery Parts
- Machining:Machining Center
- Material:Aluminum
- Surface Preparation:Polishing
Base Info
- Model NO.:XTPM-2008001
- Pressure Chamber Structure:Horizontal
- Core Steel:SKD61
- Cavity:1X1
- Lead Time:20-30 Days
- Mould Base:Lkm
- Transport Package:Wooden Box
- Specification:CE,SGS,RoHS
- Trademark:Root
- Origin:Qingdao Shandong
- HS Code:8480710090
- Production Capacity:360 Sets,Year
Description
Basic Info.
Model NO. XTPM-2008001 Pressure Chamber Structure Horizontal Core Steel SKD61 Cavity 1X1 Lead Time 20-30 Days Mould Base Lkm Transport Package Wooden Box Specification CE/SGS/RoHS Trademark Root Origin Qingdao Shandong HS Code 8480710090 Production Capacity 360 Sets/YearProduct Description




Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.
Professional Auto Engine Part Mould Manufacturer over 10 years, certificated by ISO 9001: 2008.
Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically
Specification:
Item: Plastic Injection Mold
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1200 Ton
Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.
Payment and Delivery
Payment: TT 50% in advance, Balance before shipment
Delivery Time: 30-45 days