Casting Forging

R6 Meter 3 Strands Billets Continues Casting Machine

Shanghai Electric Heavy Machinery Co., Ltd.
  • Casting Form Usage Count:Continuous
  • Casting Metal:Cast Steel
  • Casting Form Material:Metal
  • Casting Method:Special Casting
  • Surface Treatment:Spray-Paint
  • Surface Roughness:Ra12.5

Base Info

  • Specification:3strands
  • Transport Package:Plywood and Steel Frame
  • Manufacturing Level:E
  • Certification:CE, RoHS, ISO 9001:2000, ISO 9001:2008
  • Standard:AISI
  • Machining Tolerance:+,-0.15mm
  • Coating:Water
  • Model NO.:R6-3strands
  • Trademark:SEMC
  • Origin:China
  • HS Code:8454302900
  • Production Capacity:100unit,Month

Description

Basic Info.

Model NO. R6-3strands Coating Water Machining Tolerance +/-0.15mm Standard AISI Certification CE, RoHS, ISO 9001:2000, ISO 9001:2008 Manufacturing Level E Transport Package Plywood and Steel Frame Specification 3strands Trademark SEMC Origin China HS Code 8454302900 Production Capacity 100unit/Month

Product Description

Continues Casting Machine with CE certificated

Price and Equipment List for R6m, 3strands, 12meter billets CCM
NO:CCM6312
I.Technical data
1. CCM
Casting radius:R6m
Billet specification:100*100, 130*130, 150*150
Strand number:Strands 3 strands
Dummy bar:Rigid dummy bar
Ladle support:80t ladle turret
Cutting way:Automatic flame cutting machines
Electrical system:Siemens Transducer, Siemens PLC, SCHNEIDER contactors.PLC automatic controlling
Billets Size:6m12m
Pusher-type:Hydraulic pressure system, Mechanical car type.
2.Water system
A.Mould cooling water
Influent pressure:P≥0.9Mpfa
Influent temperature:≤35C
Influent effluent temperature difference:6-10C
pH:7.5-9
Water total hardness:≤150mg/L
Flow:≥360Nm3/h

B.Secondary cooling water

Hydraulic:P≥0.6Mpa
Impurity particle size:≤0.2mm
Flow:≥80Nm3/h

C.Machinery cooling water
Hydraulic:P≥0.6MPa
Impurity particle size:≤0.5mm
Flow:≥60Nm3/h

3.Gas System

A. Oxygen
Pressure:P≥0.9Mpa
Purity:≥99.5%
Flow:≥4Nm3/min

B. Gas
Pressure:P ≥0.3MPa
Combustion value:≥93700KJ/m3
Flow:≥1.5Nm3/min

C. Compressed air
Pressure:P ≥0.5MPa
Flow:Q≥5Nm3/min

Withdrawal straightening machine
Power:11KW
Rated revolution:1500/min
Billet withdrawing force(max):11000N
Straightening force (max):220000N
Tension speed range:0.3-3.0m/min
Dummy bar speed (max):3.99m/min

4.Central hydraulic station
System pressure:P≥8.0MPa
System flow:Q=37.5L/min


II.Supply cope
1.On-line equipment list
No Equipment name Unit Qty. Remark
1 Ladle turret PC 1 100t capacity for each arm
2 Tundish moving car PCS 2
3 Tundish PCS 2
4 130sq.Mm mould PCS 3
5 Mould cover SETS 3
6 Oscillation device SETS 3
7 Secondary cooling manifold(stainless steel) and support SETS 3
8 Guide section for secondary cooling SETS 3
9 Steam drainage system in the secondary cooling system SET 1
10 Withdrawal straightening machine SETS 3
11 Dummy bar PCS 3
12 120sq Dummy head and transition head SETS 3
13 Dummy bar guide wheel SETS 3
14 Dummy bar storage device SETS 3
15 Dummy bar heat protetion cover PCS 3
16 Roller table before cutting Group 3
17 Transmit roller table Group 3
18 Discharge roller table Group 3
19 Transverse pusher SET 1
20 Cooling bed SET 1 Step by step
21 Overflow chute PCS 6
22 Hydraulic station system SET 1
23 Cooling water distribution system SETS 3
24 Electrical system SETS 3
A Power supply conbinet SET 1
B Frequency conbinet SETS 3
C PCL conbinet SET 1
D Main operating table SET 1
E Suspension operating box SETS 3
F Small operating box SETS 3
27 Steel structure platform Batch 1
A Main operating platform
B Temperature test platform
C Dummy bar storage platform

2Auxiliary equipment
No. Equipment name Unit Qty. Remark
1 Water pipe, connector valve.etc Batch 1
2 Various cable, tube.etc Batch 1
3 Drainage gun PCS 3
4 Cutting gun PCS 3

2. Price:USD FOB Shanghai.
3. Lead time;100 days
4. 30% advance payment, 30% payment 20 days after first payment, 40% payment
Paid before date of shipment.Management Installation:(we consider send 3 engineers to your factory), ACCOMMODATION AND TRANSPORTATION COSTS will be paid by buyer.Totally overse charges paid by buer.
The buyer shall compensate the experts at USD 150 per day for delaying time per engineer.The seller should be responsible for the scene testing;After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months

Delivery by 1 piece frame container, 1 piece 40HQ container, 5 pieces 40GP container.
.