
Customized Stainless Steel Precision Cast Flange
Qingdao Xinghe Machinery Co., Ltd.- Casting Method:Thermal Gravity Casting
- Process:Investment Casting
- Molding Technics:Pressure Casting
- Application:Electronic Accessories
- Material:Stainless Steel
- Surface Preparation:Polishing
Base Info
- Model NO.:oem
- Surface Roughness:Ra3.2
- Machining Tolerance:+,-0.10mm
- Standard:AISI
- Certification:ISO 9001:2000, ISO 9001:2008, ISO 9001:2008, AISI, Ce, Ieo, SGS
- Item:Customized Stainless Steel Precision Cast Flange
- Technology:Precision Casting
- Surface Finish:Polishing, Anodising, Powder Coating etc
- Type:Drilling, Tapping, Milling, Machining
- Strict QC:Reliable Quality with Precision 0.05
- Size and Length:Sandard or Custom Require
- The Price of The Product:Factory Price
- Warranty:20 Years
- Delivery Time:30 Days After Payment
- Package:as Per Your Request
- Transport Package:1.Polybag , Carton,2.Pallet or Container.3.Custom
- Specification:ISO 9001: 2008, AISI, CE, IEO, SGS
- Trademark:XINGHE
- Origin:Qingdao China
- HS Code:7325109000
- Production Capacity:1000 Tons Per Month
Description
Model Type
flange
Product Name
Factory Supply stainless steel pipe elbow pipe fitting
Brand
PEMCO/OEM/ODM
Material
Stainless Steel 304/316
Quality
First Grade
Finish
Satin/Mirror
Diameter
63 / 51 / 38 mm
Thickness
0.6mm~5mm
Mounted
Flooring
Application
*Construction And Handrail Use
*Shopping Mall,House
Feature
Beautiful Outlook, Easy To Clean, Low Maintenance Cost
Related Keywords
Elbow / Stainless Steel Elbow / Pipe Elbow / Elbow 90 / 90 Elbow / Stainless Steel Elbow Prices / Stainless Steel 90 Degree Elbow / Stainless Elbow
Usage
Widely Used On Stainless Steel Balustrade & Handrails, Indoor Or Outdoor Decorations,Etc.
MOQ
200-1000 Pieces
Delivery Time
15-30Days after deposit






Test Equipment


Packaging

Q&A
1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold.
Order time: 35-40 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced
Order time:50% deposit,50%to be paid before shipment.
5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX
6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip
galvanizing, electrophoresis, chrome plating.
7.What is your way of packing?
Normally we pack goods according to customers' requirements.