Casting Forging

Flexible Pipe/Metal Joint for Lean Pipe System (KJ-6)

King 9 Technology Company Limited
  • Application:Flow Rack,Storage Flow,Workstation
  • Molding Technics:Stamping
  • Molding Style:Stamping
  • Processing Object:Metal
  • Material:SPCC
  • Heat Treatment:Tempering

Base Info

  • Specification:260*210*185mm
  • Transport Package:100set,Box Include 100set Screws
  • Certification:RoHS, ISO 9001:2000
  • Standard:GB
  • Forging Tolerance:+,-0.1mm
  • Surface Treatment:Electrophoresis
  • Model NO.:KJ-6
  • Trademark:king9
  • Origin:China
  • HS Code:7307990000
  • Production Capacity:800000000PCS,Year

Description

Contains 100 sets of screws/box


Metal joint is designed for lean tube in order to connect the pipe .
The metal joints are available in blank, zinc plated, chrome plated and nickel plated.
The thinkness of the joint steel is 2.5mm.


Flexible Pipe/Metal Joint for Lean Pipe System (KJ-6)

Flexible Pipe/Metal Joint for Lean Pipe System (KJ-6)
Flexible Pipe/Metal Joint for Lean Pipe System (KJ-6)










Flexible Pipe/Metal Joint for Lean Pipe System (KJ-6)

FAQ:

Q1: Are you manufacturer ?
A: Yes,We are manufacture since from 2000, is a well-known company with good reputation in China even Asia.

Q2: If I need sample, could you support?
A: We can supply you with the sample for free, but the delivery charges will be covered by our customers. For avoiding the misunderstanding, it is appreciated if you can provide the International Express Account for Freight Collect.

Q3: How do you pack your product?
A: Packing steps for aluminum windows:
Step 1.Protective tape protects frames from scratches;
Step 2.Keep windows fixed on iron pallets;
Step 3.Tie up windows on the iron pallets with plastic belts;
Step 4.PE films keep windows away from sea water;
Step 5.Fill in the space between each two iron pallets by air bags;
Step 6.Tie up iron pallets in container with plastic belts.
Our packages will ensure the windows arrive at project jobsite in good conditions

Q4: What's your payment term?
A: For the fist order, we usually use 30% T/T deposit + 70% T/T before loading the container. For future order, we can do 30% T/T deposit + 70% T/T balance against B/L copy.