Casting Forging

Alloy Metal Aluminium/Zinc/Zamak Die Casting with Heat Sink Parts

Qingdao Xinghe Machinery Co., Ltd.
  • Die Casting Machine Type:Cold Chamber Die Casting Machine
  • Die Casting Method:Precision Die Casting
  • Application:Electronic Accessories
  • Machining:CNC Machining
  • Material:Aluminum
  • Surface Preparation:Grind

Base Info

  • Model NO.:Custom die casting
  • Pressure Chamber Structure:Horizontal
  • Tolerance Grade:6
  • Casting Surface Quality Level:2
  • Certification:CE, RoHS, ISO 9001:2000, ISO 9001:2008
  • Name:Alloy Metal Aluminium Die Casting
  • Technology:Die Casting
  • Product Material:Aluminum, Aluminium Alloy etc.
  • Product Standard:ISO 9001:2008, AISI, Ce, Ieo, SGS
  • Secondary Machining:Drilling, Tapping, Milling, Grinding, etc.
  • Surface Treatment:Polishing, Power Coated, etc.
  • Delivery Time:30 Days After Payment
  • Packaging:as Per Customer′s Requirement
  • Dimensions:Customized
  • Tolerance:+,-0.05
  • Process:Casting+Machining
  • Secondary Process:Tapping, Drilling
  • Drawing:as Customer′s Required
  • Type:OEM Zinc Die Casting
  • QC:Professional Inspection
  • Transport Package:According to Customers′ Requirement
  • Specification:As drawings
  • Trademark:XINGHE
  • Origin:Qingdao, China
  • HS Code:8480490000
  • Production Capacity:200tons to 500tons Per Month

Description

Overview Recommend ProductsOur Factory 

Alloy Metal Aluminium/Zinc/Zamak Die Casting with Heat Sink PartsAlloy Metal Aluminium/Zinc/Zamak Die Casting with Heat Sink Parts

Mould Warehouse

Alloy Metal Aluminium/Zinc/Zamak Die Casting with Heat Sink Parts

FAQ

Q: How can I get the quotation?
A: Please send us the drawing, quantity, weight and material of the product.


Q:If we don't have drawing, can you make drawing for me?
A:Yes, we are able to make the drawing of your samples and duplicate the samples.


Q:What kind of file can you read?
A:PDF, IGS, DWG, STEP,etc...

Q:What is your way of packing?
A:Normally we pack goods according to customers' requirement.
For reference: wrapping paper, carton box, wooden case, pallet.

Q:When can I get the samples and your main order time?
A:For samples: 30-40 days after start to make mold.
For order: 35-40 days, the accurate time depends on product.

Q:What's your payment term?
A:Tooling: 100% T/T advance.
Order: 50% deposit, 50% to be paid before shipment.

Q:Where is the location of your company? Can we visit?
A:We are in Qingdao, China. You are always welcome to visit us.