Casting Forging

Brass Sand Casting Copper Sand Casting Bronze Sand Casting Process

Qingdao Seger Industrial Co., Ltd.
  • Casting Method:Lost Wax Casting
  • Process:Lost Wax Casting
  • Molding Technics:Gravity Casting
  • Application:Hardware
  • Material:Copper Alloy
  • Surface Preparation:Sand Blast

Base Info

  • Model NO.:SE-270
  • Surface Roughness:Ra3.2
  • Machining Tolerance:+,-0.10mm
  • Standard:ASTM
  • Certification:ISO 9001:2008
  • Technical:CNC Maching
  • Custom Design:Ok
  • MOQ:400PCS
  • Lead Time:30~35 Days
  • Transport Package:Carton Box + Pallet
  • Specification:ISO2000
  • Trademark:Seger
  • Origin:Shandong, China
  • HS Code:8401309000
  • Production Capacity:50, 000 PCS Per Month

Description

PackingA. Plastic Bag+ Carton boxB. Plastic Bag+ Carton Box + Wooden Case/palletC: If you have special requirement about single packing,for example:color card,color box,bar code etc for retailer use directly,you may let me know.We will help you with our cooperated company of package.For all parts,we will take care of their packing to ensure the long-time sea delivery and avoid rusting
Brass Sand Casting Copper Sand Casting Bronze Sand Casting Process

Technics and Inspection:
For brass parts,we may adopt investment casting and sand casting based on different quality requirement.
Brass Sand Casting Copper Sand Casting Bronze Sand Casting Process
Seger quality control will be performed at each stage from the material to the inspcetion before shipment.
Brass Sand Casting Copper Sand Casting Bronze Sand Casting Process

Our Service:

*A "bespoke" service to make castings and forgings to customers specific requirements with drawings, samples

*Market-oriented, different grades of products geared to the needs of different customers

*Advance equipment, professional technology and serious inspection procedure to ensure good quality

*In-time delivery will always satisfy customers" needs

*Best after-sale service all the time for a long trade cooperation term

FAQ:

Q1: What's the lead time?
A1: In general, the lead time is about 30~40 days for opening new moulds and mass production.

Q2: What file formats does Seger accept for drawings:
A2: The company ca accept a range of formats for drawings, but the main ones are detailed below: 2-D PDF AND TIFF 3-D STL, IGES, STEP, Solidworks, etc

Q3: Is it possible to visit seger to view it's manufacturing process?
A3: We are extremely proud of our facility and existing customers to visit our company. We think you will be impressed by us, as well as the warm welcome from our friendly, experienced team.

Q4:How can I get the quotation?

Please send us information for quote: drawing, material, weight, quantity and request.


For more questions,welcome to contact Lisa RIGHT NOW!!!

When you send us inquiry,pls also tell us:

1.drawings
2.Material and demand quantity
3.If you have special requirement about machining,surface treatment,heat treatment,packing etc.

The more info you tell us,the faster the quotation will be sent to you.

Weclome to contact Lisa.24 HOURS SERVICE for you.